Elche University Building no. 4, Alicante (Spain)
This project was composed of 5 floors (basement, ground floor, first and second floor, and roof).
The centre structural floor, from the second floor to the roof, was made with hollow-core slabs supported by beams on-site. Façades were made with 10 cm thick solid concrete panels, with grey and smooth finish, and others finished in "Macael" white or in pebbledash.
Project Data
- Client: Acciona Infraestructuras
- Owner: Miguel Hernández University(U.M.H)
- Year of completion: 2013
- Contract value: €245,937.00: 245.937,00€
- Products provided: C-35 slabs, solid panels e=10 cm