Underground Metro Station, Valencia
This project is divided in three parts: entrance hall to platforms in the lower level, pergola-type shelter and emergency exit.
The structure at street ground level consists of a deck of prestressed hollow-core slabs measuring 30, 50 and 63 cm deep, respectively, some of which are supported by beams with lengths between 15 and 17.40 m and others by retaining walls.
Platforms consist of 20 cm deep prestressed hollow-core slabs supported by 20 cm thick prefabricated walls.
The entrance hall is composed of a grid of columns, beams and slabs with a depth of 16 cm.
For the access and emergency structures prefabricated concrete stairs, supported by metal beams, have been used.
project Data
- Client: UTE Metro 3 Alboraya
- Owner: Generalitat Valenciana
- Year of completion: 2010
- Contract value: €281,312.00
- Products provided: Columns, beams, slabs, walls
- Precast volume: 898 m³