Viaducts over Jarama river for Madrid–Barcelona high-speed rail line (Spain)
Viaducts for High-Speed Line Madrid-Barcelona-French Border with a length of 2,100 m over the Jarama River, being most of them built as 35 m isostatic sections, with the span lengths over the river of up to 55 m with a statically indeterminate solution.
This viaduct was one of the first prefabricated isostatic viaducts for high-speed lines built in Spain, which meant an important breakthrough in manufacturing followed by many others.
Project Data
- Client: UTE Mejorada (FCC S.A—COMSA)
- Owner: Ministerio de Fomento
- Year of completion: 2001
- Contract value: €8,000,000
- Products provided: isostatic and statically indeterminate U-beams
- Precast volume: 7,500 m³
- Deck: 29,000 m3