Puebla Elevated Highway
MEXPREPAC S DEL RL DE CV, a company 100 % owned by GRUPO PACADAR, was awarded the manufacture of the precast concrete elements for the execution of the viaduct in the project "Second Floor of the Mexico-Puebla Highway" by Constructora de Proyectos Viales de México, S.A. de CV.
This structure consists of a stretch of 6.40 km with an standard deck 21.00 m width, and four areas with branches of variable width and a length of 1 km approximately. The solution chosen was an isostatic structure with different sorts of precast concrete elements. These elements are:
- Footing-columns (the only element which combines footing and column), post-tensioned to the foundation piles, with a section ranging from 2.20 x 2.20 m to 2.40 x 2.40 m.
- Headstock (Pier caps) with a variable section ranging from 2.40 x 2.30 m, a variable length ranging from 14.10 m to 31.93 m and a weight between 150Tn and 420Tn,
- U-type girders (beams) 2.30 m depth and a length ranging from 31 to 42 m, as well as a weight ranging from 205Tn to 280Tn.
- Lattice-reinforced precast slabs with a width ranging from 1.75 m to 3.00 m and a maximum length of 10.50m
The manufacturing project has been approached according to the concept of on-site plant which PACADAR develops in the frame of its internationalization strategy. Thus, in order to respond to the project in a fast and economical way, MEXPREPAC has set up a mobile factory in the State of Puebla (Mexico) which is only 900 m away from the Viaduct.
It is noteworthy that only 6 weeks elapsed between the establishment of the mobile factory and the manufacture of the first precast element (with a weight of 180 Tn).
In view of the needs of both the client and the project, this factory is able to produce more than 7.000 m³ per month of the different precast elements.
With this project, Grupo PACADAR gains a foothold in the Latin American market and becomes stronger in its internationalization plan, which started in 2009.
Project Data
- 157,500 m2 of deck
- Customer:CPVM (Constructora de Proyectos Viales de México)
- 75,800 m3 of Concrete
Precast Pieces
Type |
Quantity |
Volume (m3) |
Columns With Shoes |
222 |
65 m3/piece |
Pier Caps |
185 |
59 m3/piece |
Girders |
357 |
2 m3/ml |
Factory Implementation
- Total Surface: 50Ha
- Implementation Time: 2months
- Working Force: 400
- Total Investment: 4,5 M$
Production
- Decks: 600 m2/Day
- Lintels: 4 Piece/week
- Girders: 11 Piece/week
- Columns: 9 Piece/week