Pacadar is carrying out the manufacture, supply and assembly of the beams and precast pre-slabs for the bridge deck that will connect the industrial parks of "La Mezquita" and "El Belcaire" of the Vall D'Uixò in Castellon, and whose construction is being performing the company Becsa Simetría.
It is an isostatic bridge with a single span of 43 meters long and 14 meters wide, built in precast concrete with U beams with a 43-meter span and 140 tons each. The beams and pre-slabs have been manufactured and supplied from the Pacadar´s factory in Buñol.
This project once again shows Pacadar experience and expertise manufacturing and assembling large precast prestressed concrete structures.