Grupo PACADAR has applied its experience in the precast concrete bussiness all around the world and in the most diverse sectors, with different organizational structures and putting into practice our most innovative precast and prestressed concrete construction solutions. Some of the most representative projects where Grupo PACADAR has taken part are shown below:
PACADAR implemented a precast concrete on-site plant specialized in manufacturing of metro tunnel linings in Riyadh, Saudi Arabia, with an investment in the project exceeding 6 million euro.
Read more
We are proud of our collaboration in the execution of one of Panama's largest civil engineering projects. The project entailed the works for Panama City's Metro, the budget for which was 1,500 million dollars and was financed by the Inter-American Development Bank (IDB) and the Andean Development Corporation (CAF). Pacadar manufactured all the precast concrete structures necessary for the Metro construction.
With the purpose of increasing the crude processing capacity, Repsol YPF carried out the project C-10 for the extension of the Cartagena refinery, which is the largest industrial investment in the history of Spain.
PACADAR took part in this great project, making the precast structures, and promoted improvements at the technical level and to work execution as compared with the traditional execution for this type of structures.
The main objective of the expansion of the Kuwait International Airport was to increase its capacity and establish a new regional air hub in the Gulf. For this, the construction of the new Terminal II was carried out.
NORMAN FOSTER + PARTNERS were in charge of the design of the project, whose construction was carried out by LIMAK GROUP, one of the main Turkish construction companies, with experience in similar projects such as the airports in Egypt and Turkey.
The Thames tideway tunnel project arises from a need to modernize the London sewage system and thus prevent the discharge of untreated wastewater into the River Thames and stop its overflow. PACADAR has participated in the construction of the central and the longest section of the tunnel, which extends over 12.7 kilometers and measures 7 meters in diameter.
Construction of a precasting yard for the manufacture of the precast concrete columns, lintels, girders and decks for the construction of an elevated highway between Mexico DF and Puebla.
We have applied our on-site plant approach, which PACADAR develops in the frame of its internationalization strategy.
Below you can see a selection of our projects classified by sectors. For more details on our work and more projects, take a look at our Other Projects page.